Estadio de San Mames / San Mames Stadium
ACXT-IDOM
Bilbao, España
ACXT-IDOM
Bilbao, España
Propietario del estadio / Owner of the stadium: San Mames Barria
Arquitecto principal / Main architect: César A. Azcárate Gómez (ACXT-IDOM)
Responsable de Cliente / Client care: Alberto Tijero
Director de Proyecto / Project Director: Oscar Malo
Arquitecto adjunto / Deputy architect: Diego Rodríguez
Gestores de Proyecto / Project managers: Alexander Zeuss, Gontzal Martínez
Arquitectos colaboradores / Collaborating architects: Ricardo Moutinho, Luis Ausín
Instalaciones eléctricas / Electricity building services: Álvaro Gutiérrez, Miguel García, Mikel Lotina
Instalaciones mecánicas / Mechanical building services: Alberto Ribacoba, Jon Zubiaurre, Lorena Muñoz
Instalaciones de telecomunicaciones / Telecommunications building services: Aritz Muñoz, Ibai Ormaza
Estructuras / Structures: Armando Bilbao, Javier Llarena, Nerea Castro, Mikel
Mendicote
Demoliciones / Demolitions: Mario Liendo
Seguridad e incendios / Safety and fire: Luis González, Arturo Cabo
Urbanización / Urbanization: Alberto Fuldain, Javier Durán, Jon Ochoa
Arquitectos técnicos / Surveyors: Javier Ruiz de Prada, Gabriel Bustillo
Delineación / Draughtsman: Felipe Gaona
Fotógrafo / Photographer: Aitor Ortiz
Características principales del estadio
-capacidad: 53.500 espectadores
-localidades hospitality: 3.000
-Sky boxes: hasta 100
-Museo y tienda oficial del Club
-Restaurantes y cafeterías
-Zonas de reuniones
-Polideportivo y piscina
-Centro de alto rendimiento
-Fecha de inicio de las obras (realizadas en 3 fases): junio 2011
-Fecha de finalización del aforo completo: agosto 2014
Main characteristics of the stadium
-Capacity: 53,500 spectators
-Hospitality seats: 3,000
-Sky boxes: up to 100
-Club’s museum and official shop
-Restaurants and cafes
-Meeting areas
-Sports centre and swimming pool
-High performance centre
-Beginning date of the building works
(done in 3 stages): June 2011
-Finishing date of the entire capacity:
August 2014
El Athletic Club de Bilbao es uno de los grandes clubes del fútbol europeo,
y su anterior estadio con más de 100
años de antigüedad, fue uno de los míticos, conocido popularmente como “la
catedral del fútbol”.
Situado prácticamente en el mismo lugar que el existente, el nuevo “pisa”
con su planta el viejo San Mames, lo que ha obligado a realizar su construcción
en dos fases, de tal manera que permita al equipo no tener que disputar
partidos fuera de casa.
Uno de los retos principales en el diseño del Nuevo San Mames ha sido
mantener la atmósfera mágica e intensa de fútbol de la vieja “catedral”. Este
efecto, no solo se ha mantenido sino que se ha superado, satisfaciendo
ampliamente las exigencias de una de las mejores aficiones del mundo.
La ubicación del nuevo estadio como final de la trama urbana del
Ensanche de Bilbao asomándose de manera privilegiada sobre la Ría, convierten
al edificio en una pieza arquitectónica que debe manifestarse con fuerza y
rotundidad pero a la vez con respeto hacia el resto de las edificaciones que
completan esa zona de la ciudad. De esta reflexión surge uno de los primeros
aspectos tenido en cuenta en su diseño, como es la concepción del volumen construido como edificio urbano, en
relación con los demás y no como una mera instalación deportiva.
Se ha pretendido también dotar de
valor a aquellos lugares de los estadios que tradicionalmente no lo tienen,
estos son los lugares entre el perímetro del estadio y la parte trasera del
graderío que constituyen los espacios de circulación por donde se accede y
regresa del graderío que a fin de cuentas es el lugar principal de todo el
campo de fútbol. Para conseguir dar un valor añadido a estos espacios, la
estrategia de proyecto consiste no solo en aportar cualidades espaciales a los
mismos, sino también que esos lugares tengan una relación muy intensa con la
ciudad y el entorno. Para ello, aparece como uno de los elementos fundamentales
y que singularizarán sin duda el Nuevo San Mamés, el tratamiento de la fachada, utilizando la repetición de un
elemento de ETFE torsionado, que configura dinamismo y unidad. Este elemento
estará iluminado durante la noche, creando un hito urbano sobre la Ría que
proyectará una nueva imagen de Bilbao hacia el exterior, mediante uno de los sistemas
de iluminación dinámica más avanzados del mundo. La cubierta, formada por
potentes cerchas metálicas radiales orientadas hacia el centro del terreno de
juego, se cubre con cojines de ETFE blanco, cubriendo la totalidad del
graderío. La configuración de las gradas está absolutamente volcada hacia el
césped, haciendo que la presión de los espectadores sobre el juego sea máxima,
recordando al viejo San Mames, conocido en el mundo entero por ser una gran
olla a presión donde el público se echa encima de los jugadores.
El estadio dispone de amplias zonas para hospitality, con palcos vip,
localidades premiun y sus zonas de ocio y reunión, restaurantes, cafeterías, Museo
del Club, Tienda Oficial, zonas de reuniones, además de un polideportivo de uso
continuado para la ciudad bajo una de sus gradas. Tendrá una capacidad para más
de 53.000 espectadores.
Athletic Club of Bilbao is one of the
big clubs in European football and its previous stadium, over a hundred years
old, was one of the legendary ones, popularly referred to as the cathedral of football.
Located practically in the same place as
the existing one, the new stadium overlaps with the old San Mames. This fact
forced its construction to be carried out in two phases in such a way that it
prevented the team from having to play away.
One of the main challenges in the design
of the New San Mames was maintaining the intense and magical football
atmosphere of the old Cathedral. This
effect has not only been sustained but increased, thoroughly satisfying the
demands of one of the best fan bases in the world.
The location of the new stadium, at the
end of the urban mesh of the expansion district of Bilbao, peeping over the
estuary with privilege, turns the building into a piece of architecture that
must be introduced categorically and with force, but at the same time,
respecting the rest of the buildings that make up that area of the city. From
this reflection comes one of the first aspects borne in mind for its design.
That is, the perception of the erected
construction as an urban building, in relation to the others and not just
as simple sports facilities.
It was intended for those stadium areas that are traditionally worthless
to become valuable. These are located between the stadium’s perimeter and
the rear part of the stands and constitute the circulation areas through which
you can access and exit the stands, which are, after all, the main part of the
whole football stadium. In order to give these areas an added value, the
strategy of the project consisted of, not only giving them spatial features,
but also making sure that they had a very intense connection with the city and
the surroundings. For this purpose, a basic element that will surely give
character to the New San Mames stadium is put into play on the façade. This is, the repetition of a twisted ETFE element,
giving the elevation energy and unity. This element will be illuminated at
night, thus creating an urban landmark over the estuary, projecting a new image
of Bilbao from within, thanks to one of the most advanced dynamic lighting systems
in the world. The roof, formed by powerful radial metal trusses orientated
towards the centre of the pitch, is covered with white ETFE cushions, covering
the entire stands. The set-up of the stands is totally focused on the field,
maximizing the pressure that the fans exert on the game, just like in the old
San Mames, known the world over for being like a pressure cooker where the
public would be on top of the players.
The stadium has ample hospitality areas,
with VIP boxes, premium seating and its leisure and meeting areas, restaurants,
cafes, the Club’s Museum, the Official Shop and areas for meetings, as well as
a sports centre open to the general public under one of its stands. Its
capacity will exceed 53,000 spectators.
César Azcárate(Arquitecto Idom/ACXT)
Fotógrafo/Photographer: Aitor Ortiz
Croquis
Situación / Situation
Emplazamiento / Location plan
Alzado general ciudad / General city elevation
Sección general ciudad / General city section
Planta Sótano -2 / Basement floor -2
Planta Sótano -1 / Basement floor -1
Planta Baja / Ground Floor
Planta Primera / First Floor
Planta Segunda / Second Floor
Planta Tercera / Third Floor
Planta Cuarta / Fourth Floor
Planta Graderíos / Stands Floor
Planta Bajocubierta Graderíos / Attic Stand Floor
Planta Cubiertas / Roof Floor
Alzado Noreste / Northeast Elevation
Alzado Noroeste / Northwest Elevation
Alzado Sureste / Southeast Elevation
Alzado Suroeste / Southwest Elevation
Sección A / Section A
Sección A Detalle 1 / Section A Detail 1
Sección A Detalle 2 / Section A Detail 2
Sección B / Section B
Sección B Detalle 2 / Section B Detail 2
Sección Detalle Fachada / Elevation Detail Section
web ACXT: http://www.acxt.es/
No hay comentarios:
Publicar un comentario
Para poder comentar es necesario que cuentes con una cuenta Google, ya que esto implica que de antemano has aceptado la gestión de tus datos personales por parte de Google LLC, propietario de Blogger. En este caso, el envío del comentario es una aceptación explícita e inequívoca de la gestión tanto de tus datos como del comentario mismo para uso de AIB Architecture. La finalidad de la recogida de los datos, además de permitir mostrar tu comentario, es para poder responderte por este medio. Consulta más información en Aviso Legal y Política de Privacidad.